Construction Site Cleanup
Rough clean, debris removal, and final detail clean — timed to your project schedule so handover day isn't delayed by cleaning.
From rough clean to move-in ready
Post-construction cleanup is its own specialty — construction dust, adhesive residue, paint overspray, and debris require different tools and techniques than routine janitorial work. Faylens works directly with general contractors and project managers to hit tight handover deadlines.
We typically stage the work in phases: rough clean during active construction, then a final detail clean once finishes are complete, so the site is genuinely ready for occupancy or inspection.
Standard scope of work
- Construction debris and material removal
- Dust removal from surfaces, vents, and fixtures
- Window and glass cleaning, including adhesive/label removal
- Floor cleaning and protective film removal
- Paint overspray and adhesive residue removal
- Cabinet, fixture, and appliance detail cleaning
- Restroom and break room final clean
- Walkthrough-ready detail clean before handover
How we coordinate with your project timeline
Project Scoping
We review the build schedule and define rough-clean and final-clean phases.
Rough Clean
Debris and heavy dust are cleared as construction wraps up.
Final Detail Clean
Crews complete a top-to-bottom detail clean ahead of walkthrough.
Handover Ready
The site is inspection-ready on the date you need it.
Keep your handover date on track
Get a project-based quote aligned to your construction schedule.
Request a Free Quote